What this work involves
Start with a final kitchen installation drawing. Then establish which walls, floors and connections change. This avoids furniture that does not fit or inaccessible services.
- Removal of the existing kitchen
- Layout and wall changes
- Water, drainage, electrics and ventilation
- Floor and wall finishes
- Measuring, delivery and installation
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Use furniture arrangements to make privacy needs concrete during renovation.
Decide this before construction
Select window divisions, shading fixings and connection points in the same design round. Visible equipment then need not be fitted around completed finishes afterwards.
Which trade-off matters?
More glazing does not automatically make a better room. Compare continuous glass with a combination of glazed and solid wall areas so views, furniture and shelter each have a place.
Compare the complete intervention
Include shading, controls and the finishes around glazing from the start. A proposal omitting them is difficult to compare with one that already addresses comfort fully.
Cost factors for this service
Building preparation is often separate from the kitchen price. Include service changes and repairs to adjacent surfaces.
Bring this to the discussion
Kitchen design, installation drawing, dimensions and photographs.
Questions about the work
When should the kitchen be measured?
Agree this with the supplier. After building changes, final measuring may need to wait until the relevant dimensions are reliable.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.