What this work involves
Establish existing service routes, levels, ground conditions and access before planning excavation.
- Excavation boundaries
- Removal and reuse of soil
- Levels and surrounding connections
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate large facade openings with structure and the intended glazing divisions.
What the drawing needs to explain
Draw sightlines from two seats and show shading positions. Review the same layout in daylight and with interior lights on; privacy works differently in those situations.
Decide this before construction
Select window divisions, shading fixings and connection points in the same design round. Visible equipment then need not be fitted around completed finishes afterwards.
Cost factors for this service
Costs depend on soil volume, access and disposal arrangements. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for groundworks & site preparation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging groundworks & site preparation?
Even a small extension may need groundworks. Foundation design, existing landscaping and service routes determine the extent.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

