What this work involves
Assess heat loss, emitters, electricity supply, sound and placement together before selecting equipment.
- Hybrid or all-electric approach
- Indoor and outdoor space
- Emitters, hot water and controls
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate lighting and controls with glazing and evening privacy.
Decide this before construction
Select window divisions, shading fixings and connection points in the same design round. Visible equipment then need not be fitted around completed finishes afterwards.
Allow for later maintenance
Keep controls and glazing accessible with the final furniture arrangement. Store glazing and shading instructions together, including any restrictions on cleaning products.
Cost factors for this service
Costs depend on system type, building adaptations, placement and commissioning. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for heat pumps & heating adaptations. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging heat pumps & heating adaptations?
A product name or floor area is not a complete sizing assessment. A suitable proposal describes assumptions and required adaptations.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

