What this work involves
Assess roof condition, capacity, shading, cable routes and the electrical connection before choosing an array layout.
- Roof and array layout
- Inverter and cable route
- Monitoring and maintenance access
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate lighting and controls with glazing and evening privacy.
Decide this before construction
Select window divisions, shading fixings and connection points in the same design round. Visible equipment then need not be fitted around completed finishes afterwards.
Allow for later maintenance
Keep controls and glazing accessible with the final furniture arrangement. Store glazing and shading instructions together, including any restrictions on cleaning products.
Cost factors for this service
Costs depend on panel quantity, roof access, electrical upgrades and system selection. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for solar panels & roof preparation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging solar panels & roof preparation?
Coordinate roof maintenance with installation. A roof approaching renewal may need work before panels are fitted.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

