What this work involves
Establish handing, clear opening, hardware, threshold and wall or floor junctions before ordering.
- Door and frame materials
- Hardware and locking
- Threshold and seals
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Include shelter, opening elements and shading in the glazing decision.
What the drawing needs to explain
Draw sightlines from two seats and show shading positions. Review the same layout in daylight and with interior lights on; privacy works differently in those situations.
Allow for later maintenance
Keep controls and glazing accessible with the final furniture arrangement. Store glazing and shading instructions together, including any restrictions on cleaning products.
Which trade-off matters?
More glazing does not automatically make a better room. Compare continuous glass with a combination of glazed and solid wall areas so views, furniture and shelter each have a place.
Cost factors for this service
Costs depend on bespoke sizing, materials, hardware and junction repairs. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for entrance & external doors. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging entrance & external doors?
Replacing only the door leaf is appropriate when the existing frame is suitable. Check dimensions, condition and hardware together.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

